Facebook
RSS

Webinar on : Key Performance Indicators – Strategic Lever for High Performance


Join this 45 minute informative session to understand the capabilities of generating right KPI’s to align the operational performance with your business goals.

A useful maintenance KPI lets you identify the issues causing your maintenance effects and helps you select the right strategy to either support or correct the actions producing the results. The webinar will focus on how analytics can assist you identify KPI that drive business performance, higher equipment reliability and lower operational risks.

Session Content:
  1. How to develop metrics using CMMS data to help monitor overall maintenance & reliability
  2. How analytics can drive your reliability & maintenance operations to align with corporate goals
  3. Develop understanding of leading & lagging indicators
  4. Monitor organizational performance by linking metrics, dashboards & scorecards with detailed operational reports
Register now to understand the capabilities of generating right KPI’s to align the operational performance with your business goals.
[ Read More ]

Webinar on Maintenance Cost Analysis



Session Content:

The webinar on “Maintenance Cost Analysis” will provide insights to make strategic & tactical decisions related to the cost of asset maintenance by leveraging data captured in the CMMS like Maximo & SAP PM. It will cover topics such as

- Maintenance Spend Analysis
- Repair V/S Replace Decisions
- Labor & Spares cost
- Asset life cycle cost analysis & total cost of asset ownership
- Forecasting maintenance and capital cost for planning & budgeting
- ROAI computation
- Maintenance budget monitoring
- Downtime cost estimation & monitoring

Join this webinar and learn how to achieve visibility & control on the cost factors for managing Assets.
[ Read More ]

Webinar | Analytics Framework to Drive Asset Performance Management



This webinar is focused on how analytics framework can drive Asset Performance Management. It will address how organizational goals can be aligned & monitored with all the activities & outcomes related to enterprise assets operations, maintenance, reliability and engineering.

Session Content:

- Developing a maintenance performance framework that aligns maintenance
strategy with business objectives.
- Executing the maintenance strategies and monitoring the performance gaps.
- Attain visibility across business process using advanced data analysis and
reporting techniques like OEE, cost & EHS risk etc.

Key take away :

- Strategies to align your organizational vision and goals related to asset
management
- Understand how to manage and analyze large asset data generated from the
systems
- Holistic approach to performance measurement that assesses the contribution of
the maintenance function to manufacturing and business strategic objectives

To join clinck on following link https://attendee.gotowebinar.com/9zl48/register/5906318422312561152
[ Read More ]

Are you spending time on Planned Downtime?

You can avoid some expensive burn-outs if you opt for preventive maintenance and not reactive maintenance

WE will cross the bridge when it comes. That’s a nice philosophy to have in life.
But not in a plant. Certainly not with machines.
Every machine comes with a suffix called maintenance attached to it.
That’s why the term called AMCs (Annual Maintenance Contracts) is a highlight of many a sales negotiation talk too.
And yet, maintenance is orphaned once the machine gets out of the crib.
The crying baby gets the milk. So is the approach we often take with maintenance too.
But, maintenance is not just strutting about with some nuts and bolts to be used when something screeches, or howls or makes a noise.
Its scope is broad and deep and that’s probably why we still don’t embrace the right approach to maintenance.

Maintenance Approaches:
Maintenance can be broken into categories – Proactive and Reactive. Proactive is further divided into two classes- Preventive and Predictive while Reactive can be split into – Corrective and Emergency.
Reactive maintenance, the easiest approach, the oft-used approach, the out-of-sheer-habit approach. But look closer and you will find that the worst thing that a company can do is spend a lot of time in reactive maintenance.
Reactive approach includes a lot of unplanned downtime in contrast to planned downtime.
Often many reasons incline a company towards reactive way of maintenance. Like:
1. High pressure environment
2. Rigorous production schedules
3. Heavy targets
4. Top Management’s attitude
5. Poor record-keeping making proactive approach infeasible
6. Lack of automation in production-records and scheduling documents
7. Lack of awareness of means and methods of non-disruptive maintenance
8. Ease of application and out of regime
But, this kind of a company is not always a world-class company. Because world-class companies only apportion about 5 per cent of maintenance time to the reactive approach. The major part is done the preventive way. The reasons for doing that are born out of a long-term mindset, focus on sustainability, regard for safety, well-planned direction and a clear vision.
Why Reactive Maintenance costs a lot?
If a plant takes on the routine of repairing only when a problem occurs, it has to bear many outcomes of this neglectful approach:

1. Disruptions in schedules (Example- the way Japanese companies in Electronics and Automotive OEM industry are struggling with capacity-issues and inventory lags)
2. Loss of production man-hours
3. Impact on productivity and quality
4. Greater defects and market pull-outs of products with consequent impact on company image
5. Safety threats ( and associated issues with worker morale and confidence)
6. Over utilization of energy and bad environmental practices
7. Internal supply chain spill-over
8. Resulting
9. Inadequate leverage of AMC benefits

Ways to ensure Preventive Maintenance
It is not that difficult to take the preventive recipe and have planned downtimes. It’s much more beneficial and has a very positive long-term effect, not to mention environmental and sustainability contributions that come as a bonus when a machine is maintained at regular intervals. The ways to do it are simple:

1. Allocate planned hours from night-shifts or evening-or holiday-hours for planned shutdown or a machine outage
2. Automate and organize production records and schedules so as to allow preventive maintenance in an environment of clarity, non-overlap, transparency and control
3. Accumulate certain level of inventory for planned production interruption in advance.
4. Ensure administration of AMC personnel as per time and repair requirements
5. Use redundancies and back-up options for maintaining mission-critical equipment (example- in a turbine or a nuclear reactor or a steel furnace)

Choosing Preventive over Reactive maintenance is a major difference between an average company and a world-class firm.
Which side you want to be is ultimately your choice.
Yes, you can always cross the bridge when it comes but it would not hurt if you have a spare tire and a car in good order. Won’t it?
[ Read More ]

Business challenge selecting the Right Key Performance Indicators



When built into management processes, performance metrics become a system which will generate organizational behaviors that comply with what is measured, i.e., “you are what you measure.” Hence, this will encourage behaviors which help present a good score for the individual or for the department.

This may or may not, however, help to achieve strategic goals. Therefore, when building performance metrics, we must begin with the end result in mind. We need to focus on what we want as outcomes of our work processes. This presents a dilemma, as we do not work as a set of isolated departments, but in collaboration with others. Processes that begin with an individual are continued or completed by others. So, how do we effectively measure outcomes when a single individual or group is not controlling all the key steps?

Several basic frameworks have been proposed to build intelligent metrics that help form sets of composite measures to simplify this problem. For example, the SMART (see accompanying section “Building and Testing Performance Indicators”) test is frequently used to provide a quick reference to determine the quality of a particular performance metric. But these do not, however, address how the measures will interact to stimulate an effective network of key processes. How can individuals see what the effects of their improvements are, if these get lost in the noise of company management reports?

One problem is that business processes are segmented, and many departments are collecting silos of information that produce metrics used only for the sake of measurement. These silos then reinforce divergent opinions of company performance and limit a common understanding of what new behaviors are needed. So, a major factor in implementing performance measurement is changing the way performance is measured and reported and how people view success within their own processes.

For many organizations, this is “where the rubber hits the road:” How can we build realistic, practical metrics which drive change? How can we articulate company objectives through enterprise-wide metrics in an integrated measurement system?
[ Read More ]

Types of maintenance


1. Breakdown maintenance:
In this type of maintenance, no care is taken for the machine, until equipment fails. Repair is then undertaken. This type of maintenance could be used when the equipment failure does not significantly affect the operation or production or generate any significant loss other than repair cost. However, an important aspect is that the failure of a component from a big machine may be injurious to the operator. Hence breakdown maintenance should be avoided.

2. Preventive maintenance:
It is a daily maintenance (cleaning, inspection, oiling and re-tightening), design to retain the healthy condition of equipment and prevent failure through the prevention of deterioration, periodic inspection or equipment condition diagnosis, to measure deterioration. It is further divided into periodic maintenance and predictive maintenance. Just like human life is extended by preventive medicine, the equipment service life can be prolonged by doing preventive maintenance.
2a. Periodic maintenance (Time based maintenance - TBM):
Time based maintenance consists of periodically inspecting, servicing and
cleaning equipment and replacing parts to prevent sudden failure and process
problems. E.g. Replacement of coolant or oil every 15 days.
2b. Predictive maintenance:
This is a method in which the service life of important part is predicted based
on inspection or diagnosis, in order to use the parts to the limit of their
service life. Compared to periodic maintenance, predictive maintenance is
condition-based maintenance. It manages trend values, by measuring and analyzing
data about deterioration and employs a surveillance system, designed to monitor
conditions through an on-line system. E.g. Replacement of coolant or oil, if
there is a change in color. Change in color indicates the deteriorating
condition of the oil. As this is a condition-based maintenance, the oil or
coolant is replaced.

3. Corrective maintenance:
It improves equipment and its components so that preventive maintenance can be carried out reliably. Equipment with design weakness must be redesigned to improve reliability or improving maintainability. This happens at the equipment user level. E.g. installing a guard, to prevent the burrs falling in the coolant tank.

4. Maintenance prevention:
This program indicates the design of new equipment. Weakness of current machines is sufficiently studied (on site information leading to failure prevention, easier maintenance and prevents of defects, safety and ease of manufacturing). The observations and the study made are shared with the equipment manufacturer and necessary changes are made in the design of new machine.
[ Read More ]

An Introduction to Total Productive Maintenance (TPM)

In today’s industrial scenario huge losses/wastage occur in the manufacturing shop floor. This waste is due to operators, maintenance personal, process, tooling problems and non-availability of components in time etc. Other forms of waste includes idle machines, idle manpower, break down machine, rejected parts etc are all examples of waste. The quality related waste are of significant importance as they matter the company in terms of time, material and the hard earned reputation of the company. There are also other invisible wastes like operating the machines below the rated speed, start up loss, break down of the machines and bottle necks in process. Zero oriented concepts such as zero tolerance for waste, defects, break down and zero accidents are becoming a pre-requisite in the manufacturing and assembly industry. In this situation, a revolutionary concept of TPM has been adopted in many industries across the world to address the above said problems.

What is Total Productive Maintenance (TPM)?
It can be considered as the medical science of machines. Total Productive Maintenance (TPM) is a maintenance program, which involves a newly defined concept for maintaining plants and equipment. The goal of the TPM program is to markedly increase production while, at the same time, increasing employee morale and job satisfaction.
TPM brings maintenance into focus as a necessary and vitally important part of the business. It is no longer regarded as a non-profit activity. Down time for maintenance is scheduled as a part of the manufacturing day and, in some cases, as an integral part of the manufacturing process. The goal is to hold emergency and unscheduled maintenance to a minimum.

Why TPM?

TPM was introduced to achieve the following objectives. The important ones are listed below.
• Avoid wastage in a quickly changing economic environment.
• Producing goods without reducing product quality.
• Reduce cost.
• Produce a low batch quantity at the earliest possible time.
• Goods send to the customers must be non-defective.

Similarities and differences between TQM and TPM:

The TPM program closely resembles the popular Total Quality Management (TQM) program. Many of the tools such as employee empowerment, benchmarking, documentation, etc. used in TQM are used to implement and optimize TPM. Following are the similarities between the two.

1. Total commitment to the program by upper level management is required in both
programmes
J. Venkatesh Monday, April 16, 2007 1
2. Employees must be empowered to initiate corrective action, and
3. A long-range outlook must be accepted as TPM may take a year or more to
implement and is an on-going process. Changes in employee mind-set toward their
job responsibilities must take place as well.
[ Read More ]